2-26 Compaq ProLiant DL380 Setup and Installation Guide
4. Press the component rail release latches inward 1 on both sides of the
server, and continue to slide the server into the rack.
1
Figure 2-20. Loading the rack server
IMPORTANT: The first time you slide the server into the rack, you may have to apply
some pressure. With continued use, the ball bearings in the slide will move easily.