Isdn Provisioning; Site Preparation Checklist - Juniper J2300 Getting Started Manual

Services router
Hide thumbs Also See for J2300:
Table of Contents

Advertisement

J2300, J4300, and J6300 Services Router Getting Started Guide

ISDN Provisioning

You might need a network termination type 1 (NT1) device to connect
your ISDN interface to the ISDN service. Contact your service provider
for details on the following information:

Site Preparation Checklist

The checklist in Table 44 summarizes the tasks you need to perform when
preparing a site for Services Router installation.
Table 44: Site Preparation Checklist
Item or Task
Verify that environmental factors such as
temperature and humidity do not exceed
router tolerances.
Measure the distances between external power
sources and the router installation site.
Select the type of rack.
Plan the rack location, including required
space clearances.
Secure the rack to the floor and the building
structure.
Acquire appropriate cables and connectors.
94
Site Preparation Checklist
External NT1 device and ISDN cable
If the two items are required, where to obtain the items
List of NT1 vendors
Performed By
Date
Notes

Advertisement

Table of Contents
loading

This manual is also suitable for:

J4300J6300

Table of Contents