Network Cable Specifications; Isdn Provisioning; Site Preparation Checklist - Juniper J-series Services Router J2320 Getting Started Manual

Services router
Hide thumbs Also See for J-series Services Router J2320:
Table of Contents

Advertisement

J2320, J2350, J4350, and J6350 Services Router Getting Started Guide
Table 52 on page 112 lists the maximum power tokens and maximum heat tokens
available for each model.
Table 52: Maximum Power and Heat Capacities of J-series Models

Network Cable Specifications

The Services Router supports interfaces that use various kinds of network cable. For
information about the type of cable used by each interface, see "Network Cable
Specifications and Connector Pinouts" on page 225.

ISDN Provisioning

You might need a network termination type 1 (NT1) device to connect your ISDN
interface to the ISDN service. Contact your service provider for details on the following
information:

Site Preparation Checklist

The checklist in Table 53 on page 112 summarizes the tasks you need to perform
when preparing a site for Services Router installation.
Table 53: Site Preparation Checklist
Item or Task
Verify that environmental factors such as
temperature and humidity do not exceed router
tolerances.
Measure the distances between external power
sources and the router installation site.
Select the type of rack.
112

Network Cable Specifications

Model
J2320
J2350
J4350
J6350
External NT1 device and ISDN cable
If the two items are required, where to obtain the items
List of NT1 vendors
Power Capacity (tokens)
50
83
100
100
Performed By
Date
Notes
Heat Capacity (tokens)
50
83
100
100

Advertisement

Table of Contents
loading

This manual is also suitable for:

J6350J2350J4350

Table of Contents