Boiler inspection and maintenance
16.7 Maintenance protocol
Please check off the maintenance work as it is completed and record the measured values.
Follow the instructions on the following pages.
Maintenance work
1.
Inspection of the flue system including combustion
air, inlet and outlet openings
2.
Inspection of boiler
Gas manifold pressure
3.
Inspection of burner
4.
Cleaning of boiler
5.
Cleaning of burner
6.
Measuring gas supply pressure GC124 II or
GC124 SP
7
Measuring orifice pressure GC124 II or
GC124 SP
8.
Checking for leaks in operating condition
9.
Checking pilot burner flame GC124 II or
GC124 SP
10.
Checking main burner flame GC124 II
or GC 124 SP
11.
Check the vent damper GC124 II
or GC124 SP
12.
Check maximum aquastat GC124 II
or GC124 SP
13.
Check the area around the boiler for flammable
materials, gasoline or corrosive liquids.
14.
Confirm maintenance
Confirmation of correct maintenance
(company stamp, signature)
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Gas Boiler Logano GC124 II/SP • Issue 07/2006
Page
Date:
page 43
page 43
page 21
page 43
page 45
page 51
page 30 or page 35
–––––––
page 30 or page 35
–––––––
page 26
page 45 ff.or
page 46 ff.
page 30 or page 35
page 33 or page 39
page 34 or page 39
page 52
Date:
inches W. C.
inches W. C.
–––––––
inches W. C.
inches W. C.
–––––––
16
53