15.7 Maintenance protocol

Please check off the maintenance work as it is completed and record the
measured values.
Follow the instructions on the following pages.
Maintenance work
1.
Inspection of the flue system including combustion
air, inlet and outlet openings
2.
Gas manifold pressure
3.
Inspection of burner
4.
Cleaning of boiler
5.
Cleaning of burner
6.
Measuring gas supply pressure
7.
Measuring orifice pressure
8.
Checking for leaks in operating condition
9.
Checking pilot burner flame
10.
Checking main burner flame
11.
Check the vent damper
12.
Check high temperature limit control
13.
Check the area around the boiler for flammable
materials, gasoline or corrosive liquids.
14.
Confirm maintenance
Confirmation of correct maintenance
(company stamp, signature)
Table 12 Maintenance protocol
Logano GC 124 II – 6 720 804 440 (2012/11)
Boiler inspection and maintenance
Page
Date:
page 20
page 20
page 11
page 20
page 21
page 23
page 16
–––––––inches W. C. –––––––inches W. C.
page 16
–––––––inches W. C. –––––––inches W. C.
page 14
page 21 ff.
page 16
page 18
page 18
page 15
15
Date:
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Loganous gc 144 iiLoganoca gc 144 ii

Table of Contents