Buderus Logano GC124 II/SP Installation And Service Instructions Manual page 48

Gas boiler
Table of Contents

Advertisement

16
Boiler inspection and maintenance
15. Secure gas manifold with wire or cord.
16. GC124 II only: Remove igniter cable from ignition
module (
Fig. 45).
17. Disconnect cable connector from bottom of gas
valve (
Fig. 45).
18. Label cables to the flame roll-out switch, then
remove cable. (
Fig. 45).
48
Installation and maintenance instructions Gas Boiler Logano GC124 II/SP • Issue 07/2006
GC124 II
4
3
GC124 SP
4
3
Fig. 45 Front view (GC124 II top, GC124 SP bottom)
1 Flame roll-out switch
2 Flame roll-out switch cable
3 Gas valve
4 Gas supply pipe
5 Aquastat
6 Ignition module (GC124 II only)
7 Igniter cable (GC124 II only)
8 Gas valve cable connector
9 Pilot line
10 Igniter cable (GC124 II only) or Thermocouple cable
(GC124 SP only)
We reserve the right to make any changes due to technical modifications.
5
6
7
8
9
10
2
1
5
8
9
10
2
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents