Buderus Logano GC124 II/SP Installation And Service Instructions Manual page 58

Gas boiler
Table of Contents

Advertisement

16
Boiler inspection and maintenance
Pilot burner opera-
tion continues even-
ly
Start
Main burner
operating
END
58
Thermocouple monitors ignition flame, ignition flame generates voltage in
thermocouple and keeps ignition valve open.
Room thermostat (control) signals heat requirement
Main burner operation
• thermocouple controls ignition flame.
• main gas solenoid valve opens.
Specified thermostat value (control) reached
Main valve closes, gas burner switches off. Ignition
flame is burning.
Installation and maintenance instructions Gas Boiler Logano GC124 II/SP • Issue 07/2006
Vent damper opens.
We reserve the right to make any changes due to technical modifications.
Power interruption
System switches off. Does
the system restart when
power is restored?

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents