Moving The Boiler; Moving The Boiler With Boiler Cart - Buderus Logano GC124 II/SP Installation And Service Instructions Manual

Gas boiler
Table of Contents

Advertisement

5

Moving the boiler

5
Moving the boiler
This chapter describes how to move the boiler safely
into place.
SYSTEM DAMAGE
Due to uneven and rough surfaces.
Observe the transport diagrams on the
CAUTION!
packaging to protect the sensitive com-
ponents from damage due to rough sur-
faces. Handle the product with care.
USER NOTE
Protect all boiler connections from dirt if
the boiler is not installed immediately
following removal from packaging.
USER NOTE
Dispose of the packaging material in an
environmentally prudent fashion.
5.1

Moving the boiler with boiler cart

Move the boiler with packaging in tact and on its pallet
as much as possible.
Remove packaging straps and cardboard box from
pallet.
Remove screws that secure the boiler base to the
wood pallet.
Pick up boiler base from one side and slide to the
edge of the pallet. Place a steel pipe as roller under
the boiler base. Place additional steel pipes under
the boiler base and roll the boiler to its final destina-
tion.
10
Installation and maintenance instructions Gas Boiler Logano GC124 II/SP • Issue 07/2006
Fig. 4
Moving the boiler with rollers
We reserve the right to make any changes due to technical modifications.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents