Placing The Heating System In Operation - Buderus Logano GC124 II/SP Installation And Service Instructions Manual

Gas boiler
Table of Contents

Advertisement

11

Placing the heating system in operation

11 Placing the heating system in operation
The burner and gas train integrated in the boiler have
been tested at the factory as described in ANSI Z 21.13
to ensure safe operation of the heating system and
verify specific performance indicators.
RISK TO LIFE
due to electric shock when the cover
protecting the electric components has
WARNING!
been removed.
Before removing the cover to the electric
components:
Cut power to the heating system by
turning the emergency shut-off switch
to the OFF position, or by shutting off
the heating system circuit breaker.
Take precautions to prevent accidental
reactivation.
Preparing for operation
1. Set the room thermostat (optional) to the lowest
setting.
RISK TO LIFE
from gas poisoning.
Insufficient ventilation can lead to leaking
WARNING!
of flue gases.
Verify that all combustion air and all
flue gas openings are wide open and
not obstructed.
The boiler must not be placed in
operation unless all deficiencies have
been removed.
Inform the owner and operator of the
heating system of any deficiencies in
writing.
2. Check all combustion air and all flue gas ducts and
openings. (
Chapter 8 and 9, page 22 and
page 23).
26
Installation and maintenance instructions Gas Boiler Logano GC124 II/SP • Issue 07/2006
We reserve the right to make any changes due to technical modifications.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents