Maintenance Protocol - Buderus Logano G334 X Installation And Maintenance Instructions Manual

Hide thumbs Also See for Logano G334 X:
Table of Contents

Advertisement

13
Boiler inspection and maintenance

13.8 Maintenance protocol

Please check off the maintenance work as it is completed and record the measured values.
Follow the instructions on the following pages.
Maintenance work
1.
Inspection of the flue system including
combustion air, inlet and outlet openings
2.
Inspection of boiler
3.
Inspection of burner
4.
Cleaning boiler
5.
Cleaning burner
6.
Measuring gas supply pressure
7
Measuring manifold pressure
8.
Checking for leaks in operating condition
9.
Checking pilot and main burner flame
10.
Check maximum aquastat
11.
Check the area around the boiler for
flammable materials, gasoline or other
corrosive liquids.
12.
Confirm maintenance
Confirmation of correct maintenance
(company stamp, signature)
46
Installation and maintenance instructions Logano G334 X gas-fired boiler • Issue 09/2005
Page
Date:
page 39
page 39
page 39
page 40
page 43
page 29
–––––––
page 33
–––––––
page 29
page 34
page 43
page 43
We reserve the right to make any changes due to technical modifications.
Date:
inches W. C.
inches W. C.
–––––––
inches W. C.
inches W. C.
–––––––

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents