Preparing Boiler For Cleaning - Buderus Logano GC124 II/SP Installation And Service Instructions Manual

Gas boiler
Table of Contents

Advertisement

16
Boiler inspection and maintenance

16.4 Preparing boiler for cleaning

1. Take the boiler out of operation (
page 42).
RISK TO LIFE
from electric shock.
Before opening a unit: disconnect elec-
WARNING!
trical power and lock to prevent acci-
dental reactivation.
2. Open and remove front door of boiler (
page 27).
RISK TO LIFE
from explosion of flammable gases.
Never work on gas lines unless you are
WARNING!
licensed for this type of work
3. Turn gas valve ON/OFF knob clockwise to OFF
position. Do not use force.
RISK TO LIFE
from explosion of flammable gases.
Wait five (5) minutes until all gas resi-
WARNING!
dues have dissipated. Check whether
there is any smell of gas, including at
floor level. If there is a gas odor, shut of
main gas valve immediately. Turn off
power to the heating system and call
your customer service technician or
gas company.
44
Chapter 15.1,
Fig. 19,
Installation and maintenance instructions Gas Boiler Logano GC124 II/SP • Issue 07/2006
1
Fig. 38 Gas valve (GC124 II left, GC124 SP right)
1 ON/OFF knob (shown in ON position)
We reserve the right to make any changes due to technical modifications.
1