Buderus Logano GC124 II/SP Installation And Service Instructions Manual page 49

Gas boiler
Table of Contents

Advertisement

Boiler inspection and maintenance
19. Remove four (4) screws from gas manifold on top of
gas valve.
20. Remove two (2) screw nuts on burner tray and take
out the tray.
21. Remove 4 screws on sides of the top cover and lift
off.
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Gas Boiler Logano GC124 II/SP • Issue 07/2006
1
Fig. 46 Removing burner (GC124 SP shown)
1 Screw nuts (two)
2 Screws on gas manifold on top of gas valve (four)
Fig. 47 Remove top cover
16
2
49

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents