Boiler installation
Disconnect the boiler with the manual shut-off valve and
physically separate the boiler from the gas piping if the
gas piping system is pressure tested with a test pressure
greater than 1/2 psi.
If the gas supply pipe system is pressure tested at a test
pressure of 1/2 psi or less, it is sufficient to disconnect
the boiler from the gas pipe system by closing the man-
ual shut-off valve.
Use only sealant that is resistant to corrosion by LPG for
pipe connection. Only a small amount of sealant must be
applied to the external thread of the pipe connections.
If you wish to convert the boiler to propane, please con-
tact Buderus for the required conversion components.
Do not attempt to convert the boiler without the ap-
proved Buderus propane conversion parts and the rele-
vant technical documentation. The technical documen-
tation is included with the propane conversion parts.
7.4.2 Installation at high altitudes
The boiler is designed for installation at altitudes below
8500 feet above sea level.
USER NOTE
If the installation location is over 8500 feet
above sea level, please contact Buderus
for another product option as the GC124
is not approved above 8500 feet opera-
tion.
SYSTEM DAMAGE
due to dirt.
If the boiler is assembled and not in use,
CAUTION!
note the following:
Protect the boiler connections from dirt
by closing the connections.
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Gas Boiler Logano GC124 II/SP • Issue 07/2006
7
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents