3Ware 9650SE-2LPML User Manual page 159

Serial ata raid controller
Hide thumbs Also See for 9650SE-2LPML:
Table of Contents

Advertisement

www.3ware.com
To verify a unit through 3DM
1
In 3DM, choose
Management > Maintenance
2
In the
Unit Maintenance
you want to verify and click
3DM puts the selected unit in verifying mode. If verify scheduling is not
enabled on the Scheduling page, the verification process begins almost
immediately. If verify scheduling is enabled, the unit will not start
actively verifying until the next scheduled time.
A
Stop Verify
link appears next to the unit on the Maintenance page. If
you need to stop the verify process, use this link. (If initialization starts
because the unit had not previously been initialized, it cannot be halted, so
no
Stop Verify
link appears.)
To verify a unit through 3BM
1
At the main 3BM screen, select the unit by highlighting it and pressing
Enter.
An asterisk appears in the left-most column to indicate that it is selected.
2
to the
Tab
Maintain Unit
3
On the pop-up menu, select
Verification of the selected unit starts immediately.
Figure 61. Verifying a Unit
.
section of the Maintenance page, select the unit
Verify Unit
.
button and press
.
Enter
Verify
and press
Enter
Background Tasks
.
149

Advertisement

Table of Contents
loading

Table of Contents