3Com WX3000 Series Operation Manual page 705

Unified switches switching engine
Table of Contents

Advertisement

Figure 4-1 Network diagram
Device
Switch A
Switch B
Switch C
OA Server
Service Server
Host
Configuration considerations
According to the network requirements, select RIP.
For the OA server, the main link is between Switch A and Switch C, while the backup link is
between Switch B and Switch C.
For the service server, the main link is between Switch B and Switch C, while the backup link is
between Switch A and Switch C.
Apply a route policy to control the cost of routes received by Switch C to provide main and backup
links for the services of the OA server and service server.
Configuration procedure
1)
Configure Switch A.
# Create VLANs and configure IP addresses for the VLAN interfaces. The configuration procedure is
omitted.
# Configure RIP.
<SwitchA> system-view
[SwitchA] rip
[SwitchA-rip] network 1.0.0.0
Interface
Vlan-int 2
Vlan-int 3
Vlan-int 10
Vlan-int 3
Vlan-int 6
Vlan-int 10
Vlan-int 1
Vlan-int 2
Vlan-int 6
4-5
IP address
2.2.2.1/8
3.3.3.254/8
1.1.1.254/8
3.3.3.253/8
6.6.6.5/8
1.1.1.253/8
192.168.0.39/24
2.2.2.2/8
6.6.6.6/8
1.1.1.1/32
3.3.3.3/32
192.168.0.9/24

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wx3024Wx3010Wx3008

Table of Contents