Activating And Testing A Package On The Router: Example - Cisco CRS-1 - Carrier Routing System Router Getting Started Manual

Carrier routing system
Hide thumbs Also See for CRS-1 - Carrier Routing System Router:
Table of Contents

Advertisement

Chapter 6
Managing Cisco IOS XR Software Packages

Activating and Testing a Package on the Router: Example

To preview the impact of a package activation, enter the install activate command with the test option.
The test option displays the results of the operation without impacting the router. This option also
assigns a "request ID" to the action, which can be used with the show install log requestID command to
display the details of the test operation. For example:
RP/0/RP0/CPU0:router# install activate disk0:hfr-mcast-1.2.0.CSCdy123-1.2.0.CSCdy321-
1.0.0 test
Install: The idle timeout on this line will be suspended for synchronous install
operations
Install: Starting install operation. Do not insert or remove cards until the operation
completes.
Install: Now operating in asynchronous mode. Do not attempt subsequent install operations
until this operation is complete. RP/0/RP0/CPU0:router#Install 9: Install operation
'activate disk0:hfr-mcast-1.2.0.CSCdy321-1.0.0 test' assigned request id: 9 Install 9:
WARNING! No changes will occur due to 'test' option. Install 9: WARNING! The following is
the predicted output for this install command. Install 9: Performing Inter-Package
Card/Node/Scope Version Dependency Checks Install 9:
compatibility in software configurations... Install 9: [OK] Install 9: Updating software
configurations.
Install 9:
Install 9:
Install 9: WARNING! No incompatible configuration will be removed due to the 'test' option
Install 9: Checking running configuration version compatibility with newly activated
software ... Install 9: No incompatibilities found between the activated software and
router running configuration. Install 9: Node 0/2/CPU0: No processes affected Install 9:
Node 0/3/CPU0: No processes affected Install 9: Node 0/RP0/CPU0: 1 hfr-mcast processes
affected (0 updated, 0 added, 0 removed, 1 impacted)
Install 9:
updated, 0 added, 0 removed, 0 impacted)
Install 9: Activation operation successful.
Install 9: NOTE: The changes made to software configurations will not be Install 9:
persistent across RP reloads. Use the command 'install commit' Install 9: to make changes
persistent. Install 9: WARNING! No changes have occured due to 'test' option. Install 9:
Idle timeout on this line will now be resumed for synchronous install operations
RP/0/RP0/CPU0:router# show install log 9
Request id 9 by user_a at Fri Jun 04 05:28:38 2004:
Summary:
impacted)
added, 0 removed, 0 impacted)
Status Information Logs:
RP,LC:
Activating hfr-mcast-1.2.0.CSCdy321-1.0.0
: 1 hfr-mcast-1.2.0.CSCdy123 processes affected (1
1 package activated: disk0:hfr-mcast-1.2.0.CSCdy123-1.0.0 test
Node 0/2/CPU0: No processes affected
Node 0/3/CPU0: No processes affected
Node 0/RP0/CPU0: 1 hfr-mcast processes affected (0 updated, 0 added, 0 removed, 1
: 1 hfr-mcast-1.2.0.CSCdy123 processes affected (1 updated, 0
WARNING! No changes will occur due to 'test' option.
WARNING! The following is the predicted output for this install command.
Performing Inter-Package Card/Node/Scope Version Dependency Checks
[OK]
Checking API compatibility in software configurations...
[OK]
Updating software configurations.
RP,LC:
Activating hfr-mcast-1.2.0.CSCdy123-1.0.0
Configuration Examples for Managing Packages
[OK] Install 9: Checking API
Cisco CRS-1 Series Carrier Routing System Getting Started Guide
6-31

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Crs-1 series

Table of Contents