Chapter 2

Installation

This chapter provides instructions for:
Follow the instructions in the order presented, as needed.

Site preparation

Make sure the area where you will install and use the BayStack 10 PSU chassis
meets these environmental requirements:
"Site
preparation," next
"Installing the chassis" on page 45
"Installing the power supply modules" on page 48
"Powering the BayStack 10 PSU with UPS module" on page 54
"Initialization process" on page 56
Ambient temperature between 0
Relative humidity between 5% and 85% noncondensing
No nearby heat sources such as hot air vents or direct sunlight
No nearby sources of severe electromagnetic noise
No excessive dust
Adequate power source within 6 feet; one 15-Amp circuit required for each
power supply
At least 2 inches (5.08 cm) on each side of the chassis for ventilation
Adequate space at the front and rear of the chassis for access to cables
Installation and Reference for the BayStack 10 Power Supply Unit
°
°
°
°
and 40
C (32
and 104
43
F)