Installing The Rps Controller Module - Nortel 10 Installation And Reference Manual

Power supply unit
Hide thumbs Also See for 10:
Table of Contents

Advertisement

Book.book Page 35 Thursday, April 19, 2001 4:21 PM

Installing the RPS controller module

If you have not purchased the UPS components of the BayStack 10 PSU, you
must install the controller module into the chassis. This module provides SNMP
data for the power supply modules. The rear panel of this module contains an
RS-232 connector, RJ-45 port, and standard IEC AC connector. If you do not
install either the RPS controller module or the UPS module into your chassis, you
will not be able to provide power to your power supply modules and connected
devices.
To install the controller module:
1
2
3
For information about power supply module installation, refer to
power supply modules" on page
Make sure that the BayStack 10 PSU chassis is securely mounted in a rack or
on a stable surface.
Insert the controller module into the right front area of the chassis.
Ensure that the controller module is fully seated in the chassis.
Secure the module to the chassis with screws installed on the front and rear
panels of the module.
Installation and Reference for the BayStack 10 Power Supply Unit
Chapter 1 Introduction
48.
35
"Installing the

Advertisement

Table of Contents
loading

This manual is also suitable for:

Baystack 10

Table of Contents