3-4
State Display
The display according to the state of the KP100L is done. State Display includes Normal Display and Error
Display.
Normal Display
When the error doesn't occur in the KP100L, the follow content corresponding to the state of the KP100L is
displayed.
Start waiting Display
Pac
Standby
0.00/0.00/0.00kW
<<
>>
Pdc1/2/3 Standby
0.00/0.00/0.00kW
<<
>>
The Display [2] shows data and the state corresponding to the state of KP100L at that time.
State
Countdown
Start waiting
Running
Stopping
The Display [3] shows the measurement value. Select the measurement value that you want to display by
pushing the "<<" or ">>" key. The displayed item is changed every 0.5 seconds when you keep pushing the "<<"
or ">>" key. The Display [1] shows the item name of the data displayed in the Display [3].
Refer to the follow table for the item that you can select.
Item name
Pac
AC Power(L1 phase/L2 phase/L3 phase)
Pdc1/2/3
DC Power (DC1/DC2/DC3)
Vac
Grid Voltage(L1 phase/L2 phase/L3 phase)
Freq
Grid Frequency
Iac
AC Current (L1 phase/L2 phase/L3 phase)
Vdc1/2/3
DC Voltage (DC1/DC2/DC3)
Idc1/2/3
DC Current (DC1/DC2/DC3)
E-today
Daily energy production
H-total
accumulated operation time
E-total
Total Periodic Energy (accumulated energy from time user reset) E-total can be reset
by user. Refer to section "User Setting" in "3-5" [15] Clear of Total Periodic Energy
Grid Connect Photovoltaic Inverter KP100L-OD- USER'S MANUAL
Countdown Display
Pac
0.00/0.00/0.00kW
<<
preparation
Pdc1/2/3
completion
0.00/0.00/0.00kW
<<
Display (example)
30s
Standby
1.23kW
OFF
Measurement Value
Running Display
30s
Pac
1.23/1.23/1.23kW
>>
Countdown
30s
Pdc1/2/3 3.69kW
end
1.28/1.28/1.28kW
>>
Content of Date
Start-up delay time
-
AC Power
-
3 Operation
3.69kW
<<
>>
<<
>>
Data display form
1.23/1.23/1.23kW
1.23/1.23/1.23kW
230/230/230V
50.0Hz
12.3/12.3/12.3A
400/400/400V
12.3/12.3/12.3A
123.4kWh
123456hr
12345kWh
3
9
3 - 9