Installation
(1)
Set up "Mounting base plate" in the place where the weight (41.5kg) of KP100L can be endured. The
installation location should endure the torque of 176Nm with each installation screw.
Use the reinforced board when strength of the wall is insufficient.
Please prepare the board to reinforce it .
(2) Mark the positions of the 8 outer mounting holes onto the wall with the mounting base plate.
(3) Drill the 8 marked holes in the wall, and then drive the 8 Snap Bushings by the hammer into the wall,
when the wall is a hard wall like concrete.
(4) Fix the mounting base plate to the wall by using 8 mounting screws of the attachment.
Grid Connect Photovoltaic Inverte KP100L-OD-USER'S MANUAL
Use Snap Bushings when the wall is
a hard wall like concrete
Snap bushing
2 Design
8mm diameter
55mm depth
Snap bushing
Wall
Mounting
base plate
2 - 9
2