[15] Clear of Total Periodic Energy
Clear of Total Periodic Energy to 0.
[Operational Procedure]
At first, after showing the item name of "TotalClr" by you push the "<<" and ">>" key, push the ENT key. When
you push the ENT key and the MODE key at the same time for 5 second after the display became the execution
confirmation "Are you ready?", the integral power consumption clear is executed. The display becomes the
execution completion after continuing the display executing integral power consumption clear for 5 second. After
that, the display returns to the item selection after 3 second pass.
Moreover, when you push the MODE key while displaying the execution confirmation, the display returns to the
item selection without you do clear of Total Periodic Energy.
Setup:TotalClr
MODE
ENT
Setup:TotalClr
Are you ready?
Push the ENT+MODE key
for 5 second
Setup:TotalClr
Executing
Blinking the Display[3]
After 5 second pass
Setup:TotalClr
Complete
After 3 second pass
[16] Auto Test (ITA only)
Confirm each function of the OV(Over Voltage), UV(Under Voltage), OF(Over Frequency) and UF(Under
Frequency).
Refer to" 3-6 Procedure of the Auto Test".
Grid Connect Photovoltaic Inverter KP100L-OD- USER'S MANUAL