Commissioning
5.4 Quick commissioning using the BOP-2 operator panel
Figure 5-9
Figure 5-10
Ramp-down time for the OFF3 command
Motor data identification: Select the method which the converter uses to measure the data of
the connected motor:
motor rotating. The converter switches off the motor after the motor data identification has
been completed.
motor data identification has been completed.
Select this setting if one of the following cases is applicable:
– You have selected control mode
– You have selected U/f control as control mode, e.g.
motor after the motor data identification has been completed.
After the motor data identification, the motor accelerates to the current setpoint.
After the motor data identification, the motor accelerates to the current setpoint.
Complete the data entry for quick commissioning as follows:
1. Switch over the display using an arrow key:
2. Press the OK key.
You have entered all of the data that is necessary for the quick commissioning of the
converter.
136
Minimum and maximum motor speed
Ramp-up and ramp-down time of the motor
: Motor data is not measured.
: Recommended setting: Measure the motor data at standstill and with the
: Measure the motor data at standstill. The converter switches off the motor after the
: Measure the motor data while the motor is rotating. The converter switches off the
: Setting the same as
: Setting the same as
; however, the motor cannot rotate freely.
 → 
Operating Instructions, 02/2023, FW V4.7 SP14, A5E34263257B AK
or
SINAMICS G120C Converters

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g120c uss/mbSinamics g120c dpSinamics g120c pn

Table of Contents