Nortel SONET AccessNode Manual page 111

Site testing procedures
Hide thumbs Also See for SONET AccessNode:
Table of Contents

Advertisement

Procedure 4-4 (continued)
Provisioning DS1s for an integrated configuration
Step
4
5
6
Action
d. Provision the framing format by entering:
framefmt <format> ↵
where
<format>
e. Provision the type of alarm encoding by entering:
alarmenc ones ↵
Note: Alarm encoding for GR-303 DMS and TR-08 DS1s can be set only to
'ones'.
f.
Provision the synchronization mode by entering:
synchr bytesynchronous ↵
Note: Synchronization for GR-303 DMS, GR-303 MVI , and TR-08 DS1s can
only be set to 'bytesynchronous'.
g. Provision performance monitoring by entering:
pmprov <status> ↵
where
<status>
Put the DS1 facility back in service (IS) by entering:
quit ↵
chgstate is ↵
The facility goes in to service.
Repeat steps 1 through 4 for each DS1 facility to be provisioned for
integration.
Exit to the Network Element Status screen by entering:
quit ↵
—end—
AccessNode Site Testing Procedures 323-3001-221 Issue 2.0
Preparing for system integration 4-15
is the framing format:
extended superframe (for GR-303 DMS or GR-303
MVI)
dlc (for TR-08 A link)
superframe (for TR-08 B, C, and D links)
is the status of the DS1 facility performance
monitoring: enable or disable

Advertisement

Table of Contents
loading

Table of Contents