Nortel SONET AccessNode Manual page 104

Site testing procedures
Hide thumbs Also See for SONET AccessNode:
Table of Contents

Advertisement

4-8 Preparing for system integration
Procedure 4-2 (continued)
Connecting the network element to the system
Step
5
6
7
8
9
AccessNode Vol 3B 323-3001-221 Issue 2.0
Action
At the systems bay, connect the optical pigtails to their respective transmit
(Out) and receive (In) connectors on OC-3/OC-12 interface circuit packs G1
and G2, as shown.
Tx G2
Rx G2
Tx G1
Rx G1
Fiber
cross-connect
panel
CAUTION
Risk of equipment damage
When you are not conducting tests on a shelf, the shelf
cover should be in place because it is an integral part of the
air flow and electromagnetic interface (EMI) designs. Make
sure circuit packs are fully engaged or removed before
installing the shelf cover. Installing the cover with the circuit
packs disengaged could damage the equipment.
Complete the connections to the office alarm system.
Make sure no active alarms are being generated by the NE.
Remove all test equipment.
Log out of the NEUI by entering:
logout ↵
The CI pre-login screen appears.
—end—
FW-10563
Fiber cable
Rx (In)
Tx (Out)
LOS
Active
Fail
OC-12
G1
PC-10563
Rx (In)
Tx (Out)
LOS
Active
Fail
OC-12
G2

Advertisement

Table of Contents
loading

Table of Contents