Nortel SONET AccessNode Manual page 11

Site testing procedures
Hide thumbs Also See for SONET AccessNode:
Table of Contents

Advertisement

Operations, Administration, and Provisioning, Volume 4A
Network Element User Interface Description, 323-3001-300
OPC User Interface Description, 323-3001-301
System Administration Procedures, 323-3001-302
Data Administration Procedures, 323-3001-304
Operations, Administration, and Provisioning, Volume 4B
Provisioning and Operations Procedures, 323-3001-310
Line Card Provisioning Procedures, 323-3001-315
Line Card Testing Procedures, 323-3001-316
Operations, Administration, and Provisioning, Volume 4C
System Expansion Procedures, 323-3001-324
Maintenance, Volume 5A
Alarm and Trouble Clearing Procedures, 323-3001-543
Maintenance, Volume 5C
Network Surveillance Procedures, 323-3001-510
Routine Maintenance Procedures, 323-3001-546
Module Replacement Procedures, 323-3001-547
Separately Bound Documents
Bay in Central Office Installation Manual—ABM, 323-3001-201
Bay in Central Office Installation Manual—TBM, 323-3001-202
To test a remote fiber terminal (RFT) installed in a Modular Business Package
(MBP), the following additional documentation is required.
Modular Business Package Installation Manual, 323-3001-206
MPR25/MPR15 (NT5C06)
Switch Mode Rectifier, 169-2071-500
To test an RFT installed in a Series 800A outside plant cabinet (OSP), the
following document is required.
Series 800A Outside Plant Cabinet Installation Manual, 323-3001-210
AccessNode Site Testing Procedures 323-3001-221 Issue 2.0
About this document ix

Advertisement

Table of Contents
loading

Table of Contents