Nortel SONET AccessNode Manual page 113

Site testing procedures
Hide thumbs Also See for SONET AccessNode:
Table of Contents

Advertisement

Procedure 4-5 (continued)
Provisioning a new host switch for an RFT
2 From the DMS-100 host switch, the integrated digital terminal (IDT) must
Requirements
Before performing these procedures, you must do the following:
be busied (command BSY), off-lined (command OFFL), busied again,
then returned to service (command RTS). Alternatively, both embedded
operations channels on the IDT can be busied, then both returned to
service.
Verify that an OPC is connected to the network element (NE) and a
VT100-compatible terminal is connected to the OPC.
Have a userID and password that permit access to the Host Provisioning
Manager tool.
Read the command conventions for the interface you are using, either
character-mode terminal (CMT) or graphical, in OPC User Interface
Description, 323-3001-301, in Operations, Administration, and
Provisioning, Volume 4A.
AccessNode Site Testing Procedures 323-3001-221 Issue 2.0
Preparing for system integration 4-17
—continued—