Procedure 4-5 (continued)
Provisioning a new host switch for an RFT
Step
6
7
8
9
Action
Tab to either the GR-303 DMS or GR-303 MVI button for the type of host
interface you are adding, then press Ctrl_A (or keypad 0).
The selected interface type is marked. This type will appear in the Interface
column of the Provisioned Hosts list.
Tab to the OK button, then press Ctrl_A (or keypad 0).
The new host CLLI appears in the Host Provisioning Manager list.
Repeat steps 2 through 7 for each RFT that is placed into service.
To close the Host Provisioning Manager tool, complete the following
instructions:
To
display the window
menu
exit
—end—
AccessNode Site Testing Procedures 323-3001-221 Issue 2.0
Preparing for system integration 4-19
Press
Ctrl_L W (or keypad 6)
The window menu appears.
Space (or keypad 0)
The tool closes.