Procedure 4-4 (continued)
Provisioning DS1s for an integrated configuration
Step
2
Action
The parameter values for integrated DS1 ports should be as follows:
Parameter values
line coding:
line build out
alarm encoding
frame format
synchronization
Because initial DS1 provisioning is performed in Commissioning and Testing ,
Volume 3A, some of the parameters may already be set as specified above.
To reprovision any of the parameters, first take the DS1 facility out of service
(OOS). Do this by entering:
chgstate oos ↵
You are prompted to confirm the command.
Enter:
y ↵
The facility is placed out of service.
To change the parameters, display the Edit Facility screen by entering:
edit ↵
The Edit Facility screen appears.
—continued—
AccessNode Site Testing Procedures 323-3001-221 Issue 2.0
Preparing for system integration 4-13
Definition
b8zs (for GR-303 DMS or GR-303 MVI links)
ami (for TR-08 links)
depends on the distance to the switch:
short is for less than 46 m (150 ft)
medium is for 46 to 137 m (150 to 450 ft)
long is for 137 to 200 m (450 to 655 ft)
ones
extended superframe (for GR-303 DMS or
GR-303 MVI links)
dlc (for TR-08 A link)
superframe (for TR-08 B, C, and D links)
byte synchronous

Advertisement