9.5.10 Commissioning

9.5.11 Operation

EPRA14~18DAV3+W1 + ETBH/X16DA6V+9W
Daikin Altherma 3 H HT W
4P587501-1A – 2020.01
2 Insert a USB memory stick.
3 On the user interface, go to [9.N] Export MMI settings.
4 Select OK.
5 Remove the USB memory stick and close the user interface
panel and front panel.
Overview
The following items are listed in the submenu:
A
Information
Installer settings

Commissioning

User profile

Operation

About commissioning
See: "10 Commissioning" [
Overview
The following items are listed in the submenu:
C
Commissioning
User profile
Operation
Malfunctioning
Room
To enable or disable functionalities
In the operation menu, you can separately enable or disable functionalities of the
unit.
3
[A] Commissioning
[A.1] Operation test run
[A.2] Actuator test run
[A.3] Air purge
[A.4] UFH screed dryout
4
 204]
[C] Operation
[C.1] Room
[C.2] Space heating/cooling
[C.3] Tank
9
Configuration
|
Installer reference guide
199