22 Commissioning

In this chapter

22.1 Overview: Commissioning

22.2 Precautions when commissioning

RYMA5+RXYA8~20A7Y1B
VRV 5 heat pump
4P749918-1 – 2023.12
CAUTION
See
"3  Specific installer safety
complies with all safety regulations.
NOTICE
General commissioning checklist. Next to the commissioning instructions in this
chapter, a general commissioning checklist is also available on the Daikin Business
Portal (authentication required).
The general commissioning checklist is complementary to the instructions in this
chapter and can be used as a guideline and reporting template during commissioning
and hand-over to the user.
22.1
Overview: Commissioning ...................................................................................................................................................... 163
22.2
Precautions when commissioning.......................................................................................................................................... 163
22.3
Checklist before commissioning............................................................................................................................................. 164
22.4
Checklist during commissioning ............................................................................................................................................. 165
22.5
About the SV unit test run...................................................................................................................................................... 166
22.6
About the system test run...................................................................................................................................................... 166
22.6.1
To perform a test run............................................................................................................................................. 166
22.6.2
Correcting after abnormal completion of the test run ......................................................................................... 167
22.7
To perform a SV/indoor unit connection check..................................................................................................................... 168
22.8
Operating the unit .................................................................................................................................................................. 170
After installation and once the field settings are defined, the installer is obliged to
verify correct operation. Therefore a test run MUST be performed according to the
procedures described below.
This chapter describes what you have to do and know to commission the system
after it is configured.
Commissioning typically consists of the following stages:
1
Checking the "Checklist before commissioning".
2
Performing a test run.
3
If necessary, correcting errors after abnormal completion of the test run.
4
Operating the system.
DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING/SCALDING
22
|
4
instructions"  [
  14] to make sure commissioning
Installer and user reference guide
Commissioning
163

Advertisement

Table of Contents
loading

Table of Contents