To Provide The Installation Structure - Daikin EPRA16DAW1 Installer's Reference Manual

Hide thumbs Also See for EPRA16DAW1:
Table of Contents

Advertisement

6
|
Unit installation

6.3.3 To provide the installation structure

Installer reference guide
68
Check the strength and level of the installation ground so that the unit will not
cause any operating vibration or noise.
Fix the unit securely by means of foundation bolts in accordance with the
foundation drawing.
NOTICE
Level. Make sure the unit is level. Recommended:
Use 4 sets of M12 anchor bolts, nuts and washers. Provide at least 150 mm of free
space below the unit. Additionally, make sure the unit is positioned at least
100 mm above the maximum expected level of snow.
Anchor points
Pedestal
When installing on a pedestal, make sure that the discharge grille still can be put in
its safety position. See
4
safety
position" [
 72].
(mm)
800
"6.3.7 To remove the discharge grille, and put the grille in
(mm)
4× M12
EPRA14~18DAV3+W1 + ETBH/X16DA6V+9W
Daikin Altherma 3 H HT W
4P587501-1A – 2020.01

Advertisement

Table of Contents
loading

Table of Contents