8
|
Electrical installation
8 Electrical installation
In this chapter
8.1 About connecting the electrical wiring
8.1.1 Precautions when connecting the electrical wiring
Installer reference guide
90
8.1
8.1.1
8.1.2
8.1.3
About electrical compliance ..................................................................................................................................
8.1.4
8.1.5
8.2
Connections to the outdoor unit............................................................................................................................................
8.2.1
8.2.2
8.3
Connections to the indoor unit .............................................................................................................................................. 101
8.3.1
8.3.2
8.3.3
To connect the shut-off valve ................................................................................................................................ 110
8.3.4
8.3.5
8.3.6
To connect the alarm output ................................................................................................................................. 113
8.3.7
8.3.8
8.3.9
8.3.10
Before connecting the electrical wiring
Make sure the water piping is connected.
Typical workflow
Connecting the electrical wiring typically consists of the following stages:
▪
"8.2 Connections to the outdoor
▪
"8.3 Connections to the indoor
DANGER: RISK OF ELECTROCUTION
INFORMATION
Also read the precautions and requirements in the "General safety precautions"
chapter.
WARNING
▪
All wiring MUST be performed by an authorised electrician and MUST comply
with the applicable legislation.
▪
Make electrical connections to the fixed wiring.
▪
All components procured on-site and all electrical construction MUST comply
with the applicable legislation.
4
unit" [
94]
4
unit" [
101]
EPRA14~18DAV3+W1 + ETBH/X16DA6V+9W
90
90
91
92
92
93
94
94
Daikin Altherma 3 H HT W
4P587501-1A - 2020.01