Commissioning; Checklist Before Commissioning; Checklist During Commissioning; To Perform An Air Purge On The Water Circuit - Daikin Altherma 3 GEO EGSAH06UD Series Installation Manual

Table of Contents

Advertisement

8

Commissioning

NOTICE
ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.
NOTICE
Make sure that both the domestic hot water tank and the
space heating circuit are filled before turning on the power
of the unit.
If not filled before turning on power, and in case
Emergency is active, the backup heater thermal fuse may
blow. To avoid breakdown of the backup heater, fill the unit
before turning on power.
INFORMATION
Protective functions – "Installer-on-site mode". The
software is equipped with protective functions, such as
room antifrost. The unit automatically runs these functions
when necessary.
During installation or service this behaviour is undesired.
Therefore, the protective functions can be disabled:
▪ At first power-on: The protective functions are
disabled by default. After 36 h they will be automatically
enabled.
▪ Afterwards: An installer can manually disable the
protective
functions
protections=Yes. After his work is done, he can
enable the protective functions by setting [9.G]:
Disable protections=No.
functions" [ 4  29].
Also see
"Protective
8.1

Checklist before commissioning

1 After the installation of the unit, check the items listed below.
2 Close the unit.
3 Power up the unit.
You read the complete installation instructions, as
described in the installer reference guide.
The indoor unit is properly mounted.
The following field wiring has been carried out according
to this document and the applicable legislation:
▪ Between the local supply panel and the indoor unit
▪ Between the indoor unit and the valves (if applicable)
▪ Between the indoor unit and the room thermostat (if
applicable)
The system is properly earthed and the earth terminals
are tightened.
The fuses or locally installed protection devices are
installed according to this document, and have NOT been
bypassed.
EGSAH/X06+10UD
Daikin Altherma 3 GEO
4P598591-1C – 2023.02
by
setting
[9.G]:
Disable
The power supply voltage matches the voltage on the
identification label of the unit.
There are NO loose connections or damaged electrical
components in the switch box.
There are NO damaged components or squeezed
pipes on the inside of the indoor unit.
Backup heater circuit breaker F1B (field supply) is
turned ON.
The correct pipe size is installed and the pipes are
properly insulated.
There is NO water and/or brine leak inside the indoor
unit.
There are no odour traces noticeable of the used brine.
The air purge valve is open (at least 2 turns).
The domestic hot water tank kit has been installed on
the cold water inlet of the DHW tank. The pressure relief
valve (DHW circuit) purges water when opened. Clean
water MUST come out.
The pressure relief valve (space heating circuit) purges
water when opened. Clean water MUST come out.
The shut-off valves are properly installed and fully open.
The domestic hot water tank is filled completely.
The brine circuit and water circuit are filled correctly.
NOTICE
When the brine circuit is not ready to be used, the system
can be set to Compressor forced off mode. To do this,
set [9.5.2]=1 (Compressor forced off = enabled).
Space heating and domestic hot water are then provided
by the backup heater. Cooling is NOT possible when this
mode is active. All commissioning related to or making use
of the brine circuit should NOT be performed until the brine
circuit is filled and Compressor
deactivated.
8.2

Checklist during commissioning

To perform an air purge on the water circuit.

To perform an air purge on the brine circuit via brine
pump test run or 10-day brine operation function.
To perform a test run.
To perform an actuator test run.
Underfloor screed dryout function
The underfloor screed dryout function is started (if
necessary).
To start 10-day brine pump operation.
8.2.1
To perform an air purge on the water
circuit
Conditions: Make sure all operation is disabled. Go to [C]:
Operation and turn off Space
operation.
8 Commissioning
forced
off is
heating/cooling and Tank
Installation manual
37

Advertisement

Table of Contents
loading

Table of Contents