To Install The Discharge Grille - Daikin EPRA16DAW1 Installer's Reference Manual

Hide thumbs Also See for EPRA16DAW1:
Table of Contents

Advertisement

6.3.6 To install the discharge grille

EPRA14~18DAV3+W1 + ETBH/X16DA6V+9W
Daikin Altherma 3 H HT W
4P587501-1A – 2020.01
a
Drain hole
b
O-ring (delivered as accessory)
c
Drain plug (delivered as accessory)
d
Hose (field supply)
NOTICE
O-ring. Make sure the O-ring is installed correctly to prevent leakage.
INFORMATION
Electrical wiring. Before installing the discharge grille, connect the electrical wiring.
Install the lower part of the discharge grille
1 Insert the hooks.
2 Insert the ball studs.
1
3 Fix the 2 lower screws.
3
5 N•m
Install the upper part of the discharge grille
NOTICE
Vibrations. Make sure the upper part of the discharge grille is attached seamlessly to
the lower part to prevent vibrations.
4 Align and attach the left side.
5 Align and attach the middle part.
6 Align and attach the right side.
2
6
Unit installation
|
Installer reference guide
71

Advertisement

Table of Contents
loading

Table of Contents