To Connect The Power Consumption Digital Inputs - Daikin EPRA16DAW1 Installer's Reference Manual

Hide thumbs Also See for EPRA16DAW1:
Table of Contents

Advertisement

8
|
Electrical installation

8.3.9 To connect the power consumption digital inputs

Installer reference guide
116
A
B
C
B
A4P
a
Installation of EKRP1HBAA is required.
3 Fix the cable with cable ties to the cable tie mountings.
Wires: 2 (per input signal)×0.75 mm²
Power limitation digital inputs: 12 V DC / 12 mA detection (voltage
supplied by PCB)
[9.9] Power consumption control.
1 Open the following (see
1 Front panel
2 Switch box cover
3 Switch box
2 Connect the power consumption digital inputs cable to the appropriate
terminals as shown in the illustration below.
A
X1 X2
L
N
C
A4P
"6.2.5 To open the indoor
a
4
unit" [
 65]):
3
2
1
EPRA14~18DAV3+W1 + ETBH/X16DA6V+9W
Daikin Altherma 3 H HT W
4P587501-1A – 2020.01

Advertisement

Table of Contents
loading

Table of Contents