Chlorine Generation Screen - Pentair FLECK 5810 XTR Installer Manual

Hide thumbs Also See for FLECK 5810 XTR:
Table of Contents

Advertisement

Connect a remote switch (such as a differential pressure switch) to the remote start input terminals
on the back of the XTR controller board. See 5.8. Electrical connections, page 47. When the remote
switch remains closed for the number of seconds specified in the remote regeneration screen, a
regeneration will be triggered regardless of volume, capacity, or time remaining until the next
scheduled regeneration.
Press
to save and to return to the master settings screen or press
settings screen without saving.

6.3.10. Chlorine generation screen

From the secondary master settings screen press the cl generation/low salt button to display the
chlorine generation screen.
Note
Cl generation/low salt will not be available for filter metered, immediate or delayed
regeneration type.
Mandatory
On the valves of series 5810 and 5812, cl generation/low salt must be set OFF because the
chlorine cell kit managed by the XTR is not available for those valves.
cl generation/low salt: Contains settings for the chlorine generation. Select between OFF, low salt
detect. and ON.
regen. interval: Contains the setting for the chlorine generation interval. Set up from 1 to 255 to
define the interval of regeneration between each chlorination activation, e.g. 1 so that it is enabled at
every regeneration or 10 so that it is activated every 10 regenerations for instance.
Press
to save and to return to the master settings screen or press
settings screen without saving.
Ref. MKT-IM-018 / C - 08.06.2018
Installer Manual Fleck 5810 - XTR - Programming
Chlorine Gen./Low Salt
cl generation/
low salt
regen. interval
to return to the master
0n
1
to return to the master
87 / 124

Advertisement

Table of Contents
loading

Table of Contents