Huawei TaiShan Troubleshooting Manual page 82

Table of Contents

Advertisement

TaiShan Servers
Troubleshooting
Equipment Room Environment Inspection Results
7
Note [1]: The information in this column is for reference only. For details about
the actual specifications of each server, see the corresponding user guide.
Inspecting Cable Layout
Cable Layout Inspection Results
N
o.
1
2
Issue 12 (2022-08-30)
Power
● AC input: 100 V to 240
supply
V AC at 50 or 60 Hz
● DC input:
– –38.4 V to –72 V DC
(voltage range), –48
V to –60 V DC
(nominal voltage)
– 192 V to 288 V DC
(voltage range), 240
V DC (nominal
voltage)
– 260 V to 400 V DC
(voltage range), 380
V DC (nominal
voltage)
Item
Criteria
General
Route the service cables
cable
and power cables along
layout
the two sides of the
cabinet respectively.
Power
● Power cables are not
cable
tangled and are
layout
arranged in an orderly
fashion.
● Power cables are
arranged in the same
way as those in any
existing cabinets.
● No power cables are
coiled.
Copyright © Huawei Technologies Co., Ltd.
7 Preventive Maintenance
□ Normal
□ Abnormal
Brief description:
Result
□ Normal
□ Abnormal
Brief description:
□ Normal
□ Abnormal
Brief description:
75

Advertisement

Table of Contents
loading

Table of Contents