Maintenance Plan - Siemens SICHARGE UC 100 Operating Instructions Manual

Table of Contents

Advertisement

Maintenance and service
10.2 Maintenance plan
Risk of tripping or slipping
Keep the work area clean and tidy to prevent tripping and slipping.
NOTICE
Safety area for maintenance and service
Create a safety area around the mounting surface with warning signs and barriers.
NOTICE
Use personal protective equipment (PPE)
Use the required personal protective equipment for the work, such as:
• Protective shoes
• Helmet
• Safety vest
• Gloves
• Protective goggles
NOTICE
Risk of crushing or cuts
During maintenance and service, pay attention to moving parts and protruding cables and
bolts.
NOTICE
Damage to property due to foreign objects inside the station
During maintenance work, foreign bodies such as dirt, tools or loose components may remain
in the charging station. This can result in a short-circuit, reduced cooling capacity or increased
running noise. The charging station may be damaged.
• During maintenance work, ensure that no foreign objects remain in and on the charging
• Fasten loose components again after maintenance work.
• Carefully remove any dirt.
10.2

Maintenance plan

The following maintenance and service measures are necessary to maintain the functionality
and operational safety of the charging station.
152
CAUTION
station.
SICHARGE UC 100, UC 200, UC 300, UC 400, UC 600, UC 800
Operating Instructions, 10/2022, A5E50828019-AC

Advertisement

Table of Contents
loading

Table of Contents