Maintenance Plan; Servicing The Charging Station; Cleaning The Touch Screen - Siemens SICHARGE UC 150 Operating Instructions Manual

Hide thumbs Also See for SICHARGE UC 150:
Table of Contents

Advertisement

11.2

Maintenance plan

The following maintenance measures are necessary to maintain the functionality and
operational safety of the charging station.
Timing of checks
After commissioning, carry out the checks according to the "Preventive maintenance
checklist" but, at a minimum, at the following intervals:
• 2 months after commissioning
• 6 months after commissioning
• 12 months after commissioning
After the first year, carry out the checks every 12 months or at shorter intervals if necessary
due to the ambient conditions.
Check the air filter every 2 months.
Change the air filter in the door every 6 months at the latest. Change the air filters in the base
plate only if they are dirty.
Checking the charging station
Follow the steps in document "Preventive Maintenance Checklist
(https://support.industry.siemens.com/cs/ww/en/109815371)".
You can find instructions on replacing air filters and a housing fan in the following sections:
• Replacing an air filter (Page 137)
• Replacing a cabinet fan (Page 142)
11.3

Servicing the charging station

11.3.1

Cleaning the touch screen

The touch screen is designed for low-maintenance operation. Clean the touch screen
regularly to keep it in top condition.
Electric shock due to water ingress
Water entering the charging station can damage the charging station. If the unit is damaged,
dangerous voltages may be present on the cabinet or exposed components, which can cause
serious injury or death if touched.
• Always keep the cabinet doors closed during cleaning.
• Never use a high-pressure cleaner, steam jet or water jet when cleaning the charging
SICHARGE UC 150
Operating Instructions, 02/2023, A5E50068475-AB
WARNING
station.
Maintenance and service
11.3 Servicing the charging station
135

Advertisement

Table of Contents
loading

Table of Contents