Commissioning

7.1

Initial commissioning

The "Initial commissioning" section provides an overview of the activities to be performed during
initial commissioning. The following persons may perform these activities:
• Service technicians from Siemens
• External persons trained and commissioned by Siemens
Optical check
Take photos of the installation for the commission report. It is recommended to take pictures of
the front and side view of each installed device (charging units, front ends, mast hoods).
You can obtain the commissioning report and checklists from your Siemens partner.
Installation check
Switching off the circuit breaker
Before proceeding with the checklist, make sure the circuit breaker is switched off.
Note
Padlock dimensions
Use a padlock with a shackle diameter of 3 mm to 9 mm (1/8" to 3/8") to protect against reclosing.
SICHARGE UC 100, UC 200, UC 300, UC 400, UC 600, UC 800
Operating Instructions, 10/2022, A5E50828019-AC
WARNING
7
113