Application Planning; Checking Incoming Goods; Checking The Delivery For Completeness And Correctness; Checking The Transport Packaging - Siemens SICHARGE UC 100 Operating Instructions Manual

Table of Contents

Advertisement

Application planning

4.1

Checking incoming goods

4.1.1

Checking the delivery for completeness and correctness

When the carrier delivers the charging station, immediately perform an incoming goods
inspection.
Checking delivery
Start the incoming goods inspection with the following steps:
• Check the completeness of the delivery
• Check that the delivery documents correspond to the goods delivered
4.1.2

Checking the transport packaging

Start the inspection of the transport packaging with a visual inspection of the shock indicator.
Checking the shock indicator
During transport, a transport pallet with shock absorbers protects the charging station from
shocks and vibrations. However, the effect of extreme G-forces can overload the shock
absorbers. A shock indicator is attached to the transport packaging of the charging station to
detect the occurrence of such a damaging event.
Figure 4-1
SICHARGE UC 100, UC 200, UC 300, UC 400, UC 600, UC 800
Operating Instructions, 10/2022, A5E50828019-AC
SORGSAM HANDHABEN
ACHTUNG
WARNING
HANDLE WITH CARE
Indicator tube
Schematic example: Shock indicator
4
39

Advertisement

Table of Contents
loading

Table of Contents