Planet Networking & Communication LCG-300 Series User Manual page 26

Industrial lorawan gateway
Table of Contents

Advertisement

Wiring the Power Inputs
The 6-contact terminal block connector on the top panel of LoRaWAN Gateway is used for two DC
redundant power inputs. Please follow the steps below to insert the power wire.
When performing any of the procedures like inserting the wires or tightening
the wire-clamp screws, make sure the power is OFF to prevent from getting an
electric shock.
1. Insert positive and negative DC power wires into contacts 1 and 2 for POWER 1, or 5 and 6 for
POWER 2.
Please make sure the input voltage is under the specification of the LoRaWAN
Gateway.
LCG-300/LCG-300W
LCG-300-NR
- 26 -
Industrial LoRaWAN Gateway
LCG-300 series

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lcg-300Lcg-300wLcg-300-nr

Table of Contents