General Fault Isolation; Power-Up Self-Test - GE MAC 5500 Service Manual

Resting ecg analysis system
Hide thumbs Also See for MAC 5500:
Table of Contents

Advertisement

General Fault Isolation

Power-up Self-test

4-4
Troubleshooting: General Fault Isolation
See the MAC 5500 Operator's Manual, Chapter 2, "Equipment Overview: Getting
Started" to verify operation.
On power-up, the system automatically runs an internal self-test. If all circuits test
good, the start up screen displays. If the equipment is not working properly, ask
yourself the following questions.
Is the unit turned on?
Have there been any changes in the use, location, or environment of the
equipment that could cause the failure?
Has the equipment hardware or software been modified since last use?
Is operator error the cause of the problem? Try to repeat the scenario exactly
and compare that to the proper operation of the equipment described in the
manual.
Is the battery installed?
When connected to the AC wall outlet, does the green AC power light glow?
Is the writer door closed?
MAC 5500 resting ECG analysis system
2020299-020
Revision E

Advertisement

Table of Contents
loading

Table of Contents