Electrical Safety Checks
Step
1.
2.
3.
4.
1.
2.
3.
4.
5.
6.
1.
2.
3.
4.
5.
6.
1.
2.
Revision E
Maintenance: Functional Checkout Procedures
20. Current leakage and ground continuity test results meet requirements?
Perform electrical safety checks when indicated. All indicated electrical safety
checks require a pass/fail indication for steps performed. Record the
measurement values in your debrief.
Table 6. Electrical Safety Checks
Earth Leakage Current
Forward Polarity
Neutral open, Forward Polarity
Neutral open, Reverse Polarity
Reverse Polarity
Enclosure Leakage Current
Forward Polarity
Neutral open, Forward Polarity
Ground open, Forward Polarity
Ground open, Reverse Polarity
Neutral open, Reverse Polarity
Reverse Polarity
Patient Leakage Current to Ground
Forward Polarity
Neutral open, Forward Polarity
Ground open, Forward Polarity
Ground open, Reverse Polarity
Neutral open, Reverse Polarity
Reverse Polarity
Patient Leakage Current Mains on Applied Part
Forward Polarity
Neutral / Ground Closed
Reverse Polarity
Neutral / Ground Closed
MAC 5500 resting ECG analysis system
2020299-020
1
2
Condition
UUT - ON
NC
______
SFC
______
SFC
______
NC
______
NC
______
SFC
______
SFC
______
SFC
______
SFC
______
NC
______
NC
______
SFC
______
SFC
______
SFC
______
SFC
______
NC
______
3
SFC
______
SFC
______
Leakage
Result
Current Limits
Pass/Fail
300
Pass/Fail
1,000
Pass/Fail
1,000
Pass/Fail
300
Pass/Fail
100
Pass/Fail
300
Pass/Fail
300
Pass/Fail
300
Pass/Fail
300
Pass/Fail
100
Pass/Fail
10
Pass/Fail
50
Pass/Fail
50
Pass/Fail
50
Pass/Fail
50
Pass/Fail
10
Pass/Fail
5000
Pass/Fail
5000
5-29