Oce BLM500 User Manual page 94

Hide thumbs Also See for BLM500:
Table of Contents

Advertisement

Install New Stitch Wire
Step
4
5
Feed the Stitch Wire
[61]
Step
1
3
4
5
6
94
Chapter 6 Maintenance
Action
Close the folder cover..
Close the connecting bridge
cover.
Action
Touch START
.
Set the number of stitches to 6
Hand-feed or print an A4 or
larger size test job..
Check the stitch wire is
loaded.
Reset the number of stitches
on the touch screen.
Information
Information
(see 'Job Setting for a Standard Paper
Size' on page
15)
The stitch wire loads automatically
during the stitch head cycle.
Check that a stitch is made. If needed,
repeat the previous step.

Advertisement

Table of Contents
loading

Table of Contents