Hitachi GS4000 Series Installation Manual page 269

Hide thumbs Also See for GS4000 Series:
Table of Contents

Advertisement

5.7.4
Replacement or Installation of an Additional Guide Rail
Installing a standard NIF into a PSU requires that the guide rail be mounted in a PSU.
Installing a high port-density NIF into a PSU requires that the guide rail be removed from a
PSU.
WARNING: THE REPLACEMENT OF A GIDE RAIL SHOULD BE DONE BY A TRAINED
!
(1) Detachment of a Guide Rail
Comply with the following procedure when removing a guide rail.
Step 1
Remove a Packet Switching Unit.(As for the detachment of a Packet Switching
Unit, see the section 5.6.)
Step 2
Remove the screws from a guide rail of a Packet Switching Unit from the device.
Figure 5.7-18 Screws Being Removed From A Guide Rail of a Packet Switching Unit
520-10-026-30X
ENGINEER OR A QUALIFIED MAINTENANCE PERSON.
Caution: Do not touch the electronic components on the solder side of a packet
switching unit. To avoid damage, always store these components in
approved anti-static bags.
Screws
Guide Rail
PSU
GS4000 Installation Guide Revision 4.00
5-65

Advertisement

Table of Contents
loading

Table of Contents