Hitachi GS4000 Series Installation Manual page 249

Hide thumbs Also See for GS4000 Series:
Table of Contents

Advertisement

(2) Attachment of a Packet Switching Unit
Comply with the following procedure when installing a Packet Switching Unit.
Step 1
Open the levers of the Packet Switching Unit as shown in the figure below, and
insert it into the slot.
Lever
Figure 5.6-4
!
520-10-026-30X
PSU Slot
Packet Switching Unit Being Inserted Into Slot
Caution:
Do not hold the area marked with
mounting or removing a PSU from GS4000 models. Doing this might deform
the outer frame of a PSU, and NIF might be damaged if you try to insert it
into a PSU with its deformed outer frame.
Caution:
When installing a Packet Switching Unit into the device, open its levers
as shown in the figure above. If you try to install it with its levers shut or
open too wide, its levers might be damaged when being inserted into the
slot
GS4000 Installation Guide Revision 4.00
Packet Routing Unit
in the figure above when
5-45

Advertisement

Table of Contents
loading

Table of Contents