Omron i4-350L User Manual page 154

Robots with ethercat
Hide thumbs Also See for i4-350L:
Table of Contents

Advertisement

6 Maintenance
Tool Flange Replacement Procedure
Use the following procedure to replace the tool flange on the z-axis quill if necessary.
Quill Slots
Setscrew
1
Take note of the old tool flange position and orientation on the quill.
2
Loosen the setscrew and socket-head screws while holding the old tool flange in place. This
prevents it from falling off the z-axis quill.
3
Slide the tool flange off the z-axis quill.
4
Align the setscrew with the proper groove in the z-axis quill.
5
When the orientation is correct, slide the new tool flange up on the z-axis quill until it stops.
6
Apply thread lock (Loctite 243 or equivalent) to the setscrew and tighten to a torque of 1.1 N-m.
Precautions for Correct Use
Do not over-tighten the tool flange setscrew. This will cause off-center alignment of the tool
flange on the quill.
7
Apply thread lock (Loctite 222MS or equivalent) to the socket-head screws and then use a tor-
que wrench to tighten one of the socket-head screws to 1 N-m. Then, apply the same torque to
the other socket-head screws. Finally, tighten each socket-head screw to the full 2.5 N-m tor-
que.
8
When all socket-head screws are tight and the new tool flange is verified to be in the correct
orientation, the replacement procedure is complete.
6-10
Socket-head
Screws (x4)
i4L Robots with EtherCAT User's Manual (I659)

Advertisement

Table of Contents
loading

This manual is also suitable for:

I4-450lI4-550l

Table of Contents