12. When framing is complete, ensure wiring is installed by an electrician
prior to installing the unit.
13. Assemble ZC surround with 8 (904-897) screws provided in locations
shown below.
Assemble the ZC
surround with 4
screws on each
14. Secure surround to the stud on each side with screws.
Use 4 screws on each side to secure
surround to studs.
side.
15. ZC surround installed into framed opening.
16. Separate E18E inner and outer fireboxes - see installation into exist-
ing unit section in the manual for details.
17. Set E18E outside firebox legs as shown below.
Right side shown
Outside firebox shown in position - refer to
measurements (Step 18) before securing to surround.
Regency
installation
Set to this
hole
E18E-11 Gas Fireplace Insert
®
|
23