Suzuki LT-Z90 Manual page 56

Hide thumbs Also See for LT-Z90:
Table of Contents

Advertisement

3-8
ENGINE
• Install the muffler 3 and exhaust pipe 4 .
• Tighten the muffler mounting bolt and exhaust pipe bolt to the
specified torque.
The removed gasket must be replaced with a new one
to prevent exhaust gas leakage.
Muffler mounting bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
Exhaust pipe bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
• Tighten the muffler clamp bolt to the specified torque.
Muffler clamp bolt: 12 N·m (1.2 kgf-m, 8.5 lb-ft)
• Install the carburetor assembly. (
• After remounting the engine, route the wiring harness, cables
and hoses properly. (
• Adjust the following items.
* Engine oil (
2-10)
* Throttle cable play (
* Engine idle speed (
* Drive chain slack (
4-13)
7-15)
2-13)
2-13)
2-18)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents